Close Menu
TechTimes VietnamTechTimes Vietnam
  • News
  • Digital Life
  • Business
  • Tip & Trick
  • Science
  • Tiếng Việt
  • English

Đăng ký bản tin

Cập nhật thông tin, đánh giá, bình luận... trong hộp thư email.

Facebook X (Twitter) Instagram YouTube LinkedIn TikTok RSS
  • News
  • Digital Life
  • Business
  • Tip & Trick
  • Science
  • Tiếng Việt
  • English
Facebook X (Twitter) TikTok LinkedIn RSS
TechTimes VietnamTechTimes Vietnam
TechTimes VietnamTechTimes Vietnam
FingerMotion Expands Alberta Power Pipeline Through Participation in Planned Up-to-500 MW Behind-the-Meter Energy Park

FingerMotion Expands Alberta Power Pipeline Through Participation in Planned Up-to-500 MW Behind-the-Meter Energy Park

16/10/2026GlobeNewswire5 Mins Read
Play
Auto

Brooks Campus #1 draws multiple written, non-binding expressions of interest from prospective high-performance computing customers; partners intend to complete community engagement before any regulatory filings

WEST PALM BEACH, Fla., Oct. 15, 2026 (GLOBE NEWSWIRE) — FingerMotion, Inc. (Nasdaq: FNGR) (“FingerMotion” or the “Company”) today announced its participation, through its strategic development relationship with BlueFlare Group Holdings Inc. (“BlueFlare”), in a planned energy park in east-central Alberta. The park is intended to be held by an Alberta-based, Canadian-controlled landowner and designed around Alberta’s “bring your own power” framework, with on-site natural-gas-fired generation and battery storage that would add new supply rather than draw on the provincial grid. The plan contemplates development of up to 500 MW in 75 MW phases for high-performance computing and digital infrastructure customers. The first phase is planned at 75 MW, subject to completion of the land acquisition, local land-use approvals, Alberta Utilities Commission approval of the generation facilities, gas supply arrangements and project financing.

TechTimes Editors' Choice 2026
TECHTIMES VIETNAM PRESENTS
TECHTIMES EDITORS’ CHOICE 2026
Tôn vinh giá trị công nghệ đích thực · Uy tín · Khách quan · Công tâm · Minh bạch
CHI TIẾT ↗

Alberta Energy, Built in Phases

The park is designed to be powered by Alberta natural gas and to add new generating capacity in the province rather than compete with homes, farms and businesses for existing grid supply. Development in 75 MW phases is intended to allow regulators, local authorities and surrounding communities to assess each stage before the next proceeds.

Listening First

Before filing any regulatory applications, the partners intend to carry out a full participant involvement program under Alberta Utilities Commission requirements. This is expected to include open houses in the surrounding communities, direct engagement with landowners and residents, engagement with Indigenous communities, and work with local authorities on land-use approvals.

BlueFlare’s practice is to hire locally first and to work with Alberta contractors and suppliers. The partners intend to pursue training partnerships in the region and to design the park so that its benefits, including jobs, infrastructure and long-term economic activity, remain in the communities that host it.

Customer Interest at Brooks Campus #1

At Brooks Campus #1, FingerMotion’s permitted 9.9 MW campus in the County of Newell and the first site in its previously announced 99 MW Alberta build program, BlueFlare has received multiple written, non-binding expressions of interest from prospective high-performance computing customers. BlueFlare, acting as FingerMotion’s development and marketing partner, is evaluating these proposals on contract term, creditworthiness and fit with the campus design, and expects to recommend a lead offtake customer to FingerMotion. Any definitive agreement remains subject to negotiation and execution. There can be no assurance that any expressions of interest will result in a definitive agreement.

Management Commentary

“Our strategy is to pair near-term capacity at sites like Brooks Campus #1 with a deep pipeline of behind-the-meter power,” said Jolie Kahn, Chief Executive Officer of FingerMotion. “Alberta’s natural gas resources and its framework for projects that bring their own power allow us to bring capacity online in phases as customers commit.”

“Projects like this succeed in Alberta when they are built with the communities around them, not just near them,” said Landon Ruszkowski, Chief Executive Officer of BlueFlare. “The interest in Brooks Campus #1 confirms the demand is real. Our focus now is selecting the right long-term customer for the site and the community, not simply the first one, and listening to the people who live and work in the region before we build.”

About FingerMotion, Inc.

FingerMotion, Inc. (Nasdaq: FNGR) is a technology company that has historically served the mobile payment, recharge and data-analytics markets in the People’s Republic of China. Through its relationship with BlueFlare, the Company is developing behind-the-meter powered data-center capacity in Alberta for artificial-intelligence and high-performance computing clients. Additional information is available at www.fingermotion.com.

About BlueFlare Group Holdings Inc.

BlueFlare Group Holdings Inc. is a Calgary-based energy and digital infrastructure developer that designs, builds and operates behind-the-meter power and powered-land campuses across Alberta. BlueFlare hires locally first and works with Alberta contractors and suppliers.

Forward-Looking Statements

This press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, and is subject to the safe-harbor provisions of the Private Securities Litigation Reform Act of 1995. Forward-looking statements include, without limitation, statements regarding the planned energy park, its planned capacity, phasing and power design; the completion of the land acquisition; the Company’s participation in the project; the participant involvement program and community engagement; expected local economic benefits; customer interest at Brooks Campus #1 and the selection of an offtake customer; and the Company’s development pipeline. Words such as “plan,” “intend,” “expect,” “anticipate,” “design,” “potential,” “may,” “will” and similar expressions identify forward-looking statements.

These statements are based on current expectations and are subject to risks and uncertainties that could cause actual results to differ materially, including: the land acquisition may not close on the expected terms or at all; the Company does not and will not own the land and participates through contractual arrangements; local land-use approvals and Alberta Utilities Commission approvals may not be obtained, or may be delayed or conditioned; gas supply, equipment and construction may not be available on acceptable terms; project financing may not be obtained; expressions of interest are non-binding and may not result in definitive agreements; changes in Alberta and federal energy, emissions and data center policy and levies; community or stakeholder opposition; the Company’s relationship with BlueFlare; the Company’s ability to maintain its Nasdaq listing; and the other risks described in the Company’s filings with the U.S. Securities and Exchange Commission, including its most recent Annual Report on Form 10-K and subsequent Quarterly Reports on Form 10-Q. Forward-looking statements speak only as of the date of this release, and the Company undertakes no obligation to update them except as required by law.

Investor contact
FingerMotion, Inc.
Investor Relations
Email: ir@fingermotion.com
Website: www.fingermotion.com

FingerMotion Inc TechTimes Vietnam FingerMotion Expands Alberta Power Pipeline Through Participation in Planned Up-to-500 MW Behind-the-Meter Energy Park

Follow TechTimes on Google News
Share. Copy Link Facebook Twitter Pinterest LinkedIn Tumblr Email WhatsApp
Previous ArticleAUMOVIO Trailer Park Assist Named “Smart Parking Solution of the Year” By AutoTech Breakthrough
Next Article Hotdesk.com Expands to 2,000+ Locations Across Europe, Led by the UK, Spain, France, Germany and Italy

Related articles

67/2026・Trifork Group: Interim report for the quarter ending 30 September 2026

66/2026・Trifork Group: Financial guidance for 2026 narrowed within the original ranges

Binance Founder Changpeng Zhao to Open Proof of Talk at Louvre Abu Dhabi

Datasite Partners with Prudentia Sciences to Accelerate Life Sciences Diligence

GSI Technology to Participate in the 15th Annual ROTH Technology Conference

Aon and SAGE Bring Field-Level Agricultural Intelligence to Crop Insurance

Google
Add as a preferred source on Google
  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • TikTok
Latest News
  • iOS 27.2 Adds Find My Support for Apple TV Siri Remote
  • Samsung Rolls Out Android 17 to Galaxy Devices: Full List and Key One UI 9 Features
  • 67/2026・Trifork Group: Interim report for the quarter ending 30 September 2026
  • 66/2026・Trifork Group: Financial guidance for 2026 narrowed within the original ranges
  • Binance Founder Changpeng Zhao to Open Proof of Talk at Louvre Abu Dhabi
You May Like

Saviynt Unveils Industry’s First Identity Control Plane for

24/03/2026

LOS ANGELES, March 24, 2026 (GLOBE NEWSWIRE) — Saviynt, the AI-era identity security platform, today…

AI Investment Boom Redefines Global Technology Landscape, Warns Steve Brazier at Canalys Forum APAC 2025

03/12/2025

Steve Brazier highlighted the surge in AI investment, looming component shortages, and enterprise AI challenges,…

Fit-Line Global Grants Licensing to C-Hawk Technology to

15/01/2026

SANTA ANA, Calif., Jan. 14, 2026 (GLOBE NEWSWIRE) — Fit-Line Global, a leading component supplier…

Presidio Launches Adaptive Cloud Services, a New Approach

13/01/2026

NEW YORK, Jan. 13, 2026 (GLOBE NEWSWIRE) — Presidio, a leading technology services and solutions…

Buchanan Technologies Bolsters Executive Team to Support

26/02/2026

DALLAS, Feb. 26, 2026 (GLOBE NEWSWIRE) — Buchanan Technologies, a managed IT services partner focused…

Largest Brain-Scan Study Links Anxiety Disorders to Lower Choline Levels

17/05/2026

Researchers at UC Davis Health found that people with anxiety disorders consistently show reduced choline levels in…

Highway Releases Q4 2025 Freight Fraud Index: Revealing The

26/01/2026

DALLAS, Jan. 26, 2026 (GLOBE NEWSWIRE) — Highway, the leading provider of Carrier Identity® solutions,…

GSI Technology Reports 3-Second Time-to-First-Token for

29/01/2026

SUNNYVALE, Calif., Jan. 29, 2026 (GLOBE NEWSWIRE) — GSI Technology, Inc. (Nasdaq: GSIT), the inventor…

Omdia: India’s PC Market Hits Record in 2025 Amid Uncertain Outlook for 2026

20/03/2026

According to new research from Omdia, India’s PC market (excluding tablets) reached a record high in…

Google Begins Rolling Out Refreshed Workspace Icons Ahead of I/O 2026

19/05/2026

Google is introducing redesigned Workspace app icons with gradient styling and cleaner visuals, signaling a…

Canalys Forum APAC 2025: Asia–Pacific’s Channel Leaders Gather in Danang for Strategic Alignment

26/11/2025

The Canalys Forum APAC 2025 will bring top vendors, distributors, and partners to Danang this…

CableLabs and Zoom Showcase AI-Driven Framework Designed to Enhance Network and App Performance

24/03/2026

LOUISVILLE, Colo., March 24, 2026 (GLOBE NEWSWIRE) — CableLabs today announced the successful completion of…

DMCA.com Protection Status DMCA Compliance Information
TechTimes Vietnam
Facebook X (Twitter) Instagram YouTube LinkedIn TikTok
  • News
  • Digital Life
  • Business
  • Tip & Trick
  • Science
  • Tiếng Việt
  • English
TechTimes is a general electronic information portal; Governing body: TechTimes Company Limited; Address: 39/8A Street 475, Quarter 41, Phuoc Long Ward, Ho Chi Minh City; Person responsible for content: Mr. NGUYEN VAN DO; License: General electronic information portal license No. 39/GP-STTTT issued by the Ho Chi Minh City Department of Information and Communications on August 21, 2017; Supplementary license No. 23/GP-STTTT issued on March 23, 2021 and update decision No. 03/QĐ-STTTT-ICP issued by the Department of Information and Communications on March 1, 2024.

© 2026 TechTimes.vn - Continuously updating news, product reviews, sharing experiences in using high-tech products, insights and analysis from reputable experts - Email: info@techtimes.vn , Phone: 0935014085• Powered by vHost

Type above and press Enter to search. Press Esc to cancel.